Manufacturer of thermoplastic powder coating machine/line
Welcome to HANNA
We have been with you for 34 years!
HANNA delivers you the best powder coating lines with innovative, rational and economical solutions.
HANNA supports you with advanced technologies and each piece of equipment to meet your specific needs.
HANNA provides you with warranty and post-warranty service with full spare parts stock.
The china's largest powder coating equipment manufacturing plant ,since 1990 . Mainly supply one stop station service in powder coating area . Design --Production--Installation .
Our mainly products include:
Manual powder coating machine,
Automatic powder coating line,
Spray painting equipment,
Pretreatment System,
Drying Oven,
Powder Spraying Gun,
Reciprocator,
Fast Automatic Color Change Equipment,
Powder Coating Booth,
Powder Recovery Equipment,
Conveyor Chains,
Curing Oven, etc.
Product Description
High Quality Automatic Powder Coating Line
That is suitable to coat for all wire fence, metal pipelines and ports, children play areas, street furniture and lights, automotive parts, steel build and construction materials. That can be used anywhere containing metal. It suggested SA 2,5 quality sandblasting and chemical cleaning. When high strentgh and corrosion resistance are demanded, chromated or phosphating is advised before application. Temperature and heating times are optimized according to metal thickness.
1, Easy to assemble and disassemble
2, Maximum flexibility, allowing the creation of transport routes of different configurations
3, High quality production and assembly of each component
4, Excellent durability and reliability
5, Minimum maintenance requirements
6, Provides very flexible operation and simple management.
7, Easy to handle loading and unloading operations,
provide solutions for cargo handling of any size and weight.
Powder coating Curing oven
Systems |
Technical Process and Options |
Pretreatment |
washing, degreasing, etching, phosphating, blasting |
Spray Booths |
manual or automatic with powder recycle system |
Drying&Curing Ovens |
tunnel ovens, bridge ovens, box ovens |
Heating Source |
coal/diesel/bio-particles/L.P.G./N.G./electricity |
Transport system |
chain conveyor, power and free conveyor |
Pretreatment System
According products characters and customer's requirements to design the Pretreatment line ,spraying line or dipping line .(depend on different pretreatment processes)
Powder Spraying PP Booth with Cyclone Recovery System
Color change within 10mins , Powder recovery rate more than 99.2% , avoid Powder spillover .
Powder Spraying PVC Booth with filters Recovery System
Quick remove and install filters recovery system ,have air cylinder ,Convenient disassemble and color change. high-efficiency and cost saving .
Curing Oven
Bridge Type & Tunnel Type
Tunnel curing oven effective solving height not enough problem of workshop .
air curtains (
patent)at two sides of oven ,Prevent heat loss. saving fuel .
Heating System
according clients local , to choose the fuel :GAS ,diesel,Electricity,coal,bio-particle and so on . Adopt
RIELLO Italy with
proportional control Burner . fire automatically adjusted by the response signal of the probe in the oven .temperature difference controlled within
±3° . Keep the temperature stable ,Ensure the quality of curing .
Our Service
Pre-Sales Service After-Sales Service
* Inquiry and consulting support. * Installation&Training
* Design Program support. * Engineers available to service machinery overseas.
* View our Factory. * Spare parts supply
Are you a trader or a factory?
We are manufacturer and exporter. Our own factory was found in 1990,Our export office was established in 2014.
What should I provide if interested in your powder coating equipment ?
A.The material/size(max)/weight(max)of your workpiece.
B.How many of your daily output(one day=8hours,one month=30days)?
C.What heating power do you prefer: electric,gas, diesel or coal?
D.The size of your factory(length, width and height)?
How to ensure the quality of the equipment?
A,We have hundreds of patents and passed the IS9001:2015 quality management system certification.
B,The Technical Review Committee,reasonably determines and divides the stages of design, production, installation and commissioning, and formulates detailed progress plans for each stage, Strengthen the quality assurance system and quality protection measures of equipment manufacturing department.
C,We manning quality inspectors specially to control the processing quality of product strictly.
How to install equipment after purchasing your equipment?
A,We will provide installation information and installation videos
B,Our engineers will guide the installation and run the equipment.
C,After the debugging, will provide complete training and track customer device usage.
How is your company's after-sales service done?
A,Provide the list of consumables to assist customers in establishing a
comprehensive equipment maintenance system.
B,After the equipment is delivered to the customer, our company will send professionals to track the customer equipment for 60 days.
C,If customer has a device failure in the process of using the device,our company will operate the device remotely through the computer network through the authorization given by the customer, and eliminate all equipment failure problems. D,Any problems with the equipment, our company guarantees to give solutions within 12 hours.