• High Recovery Rate 99.2% Powder Coating System
  • High Recovery Rate 99.2% Powder Coating System
  • High Recovery Rate 99.2% Powder Coating System
  • High Recovery Rate 99.2% Powder Coating System
  • High Recovery Rate 99.2% Powder Coating System
  • High Recovery Rate 99.2% Powder Coating System

High Recovery Rate 99.2% Powder Coating System

Type: Electrostatic Spraying Equipment
Application: Hardware Spraying Equipment
Coating: Powder
Certification: CE, ISO
Method Type: Automatic
Condition: New
Customization:
Diamond Member Since 2019

Suppliers with verified business licenses

Manufacturer/Factory

Basic Info.

Model NO.
HN-1902
Transport Package
by Sea Container
Specification
customed
Trademark
HANNA
Origin
China
HS Code
8424300000
Production Capacity
15

Product Description

High Recovery Rate 99.2% Powder Coating System 
Welcome to HANNA
We have been with you for 30 years! 
HANNA delivers you the best powder coating lines with innovative, rational and economical solutions.
    HANNA supports you with advanced technologies and each piece of equipment to meet your specific needs.
HANNA provides you with warranty and post-warranty service with full spare parts stock.
The china's largest powder coating equipment manufacturing plant ,since 1990 . Mainly supply one stop station service in powder coating area . Design --Production--Installation .
High Recovery Rate 99.2% Powder Coating System

PP Booth with Cyclone Recovery System

High Recovery Rate 99.2% Powder Coating System
 

Color change time: 10-15 minutes

Features:

A. No dust spillover ,reduce powder wasting   

B. Large cyclone recovery system powder recovery rate as high as 99.2%

C. Save labor time 

D. Improve the quality of spraying

Hanna patented technology: The cyclone bottom powder vibrating screen metal filter mesh is equipped with an insulating mesh plate to prevent the electrostatic filter from clogging the metal filter mesh for a long time,  thus prolonging the service life and achieve high powder recovery rate.

High Recovery Rate 99.2% Powder Coating System
 

Suitable field: Multi-color change,suitable for spraying more than 3 colors.

Working principle:

The powder is automatically transported from the powder supply center to the electrostatic spray gun under the action of air power source.

The electrostatic powder is partially sprayed onto the surface of the workpiece,Part of the remaining powder is recycled by cyclone and continues to be used. An extremely small amount of powder (0.8% or less of powder) is sent to the secondary recovery unit,then through the rotary wing filter and left in the powder collecting bucket. The powder passing through the secondary recovery unit is ultrathin powder or mixed color powder, can't be reused.

High Recovery Rate 99.2% Powder Coating System
 

Recovery working principle of the powder coating booth:

The working state, the centrifugal fan pulverized the air out of the powder room through a filter element ,an extrovert air flow is formed at the nozzle of the spray chamber, the air flow can ensure the flying powder will not overflow,due to the filter element exists, only the air can pass through a discharge fan, the powder will be blocked by the filter element, staying in the powder coating room. When working for a long time, due to the powder accumulated in the surface of the filter element, which makes it blocked, causing recovery effect of the recovery system is reduced, so installing "pulse clean system" automatically clean powder in the outer surface of the filter element to guarantee the smooth flow of the wind, so as to ensure the continuous powder coating process, maintain good recovery effect in the recovery system.

High Recovery Rate 99.2% Powder Coating System
 

Powder spray room: PP single or double plate

PP plate material characteristics and working principle

1. Insulating material, non-conductive, won't cause bulk powder accumulation problems, easy to clean, save time and labor.

2. The electrostatic powder forms a light and thin layer on the surface of the material, which has a rebound effect on the electrostatic powder afterwards, effectively avoiding powder accumulation.

High Recovery Rate 99.2% Powder Coating System
 

PP double plate or sandwich structure

The sandwich structure is hollow design and has a rebound effect on the electrostatic powder, effectively avoiding powder accumulation.

Groove design on spray booth bottom

Working principle:

Part of the electrostatic powder that has not been sprayed on the surface of workpiece will fall by its own gravity factor, affected by the micro-negative pressure at the groove,then directly into the filter recovery unit.The spray room floor avoids powder accumulation and is easy to clean. 

ApplicationHigh Recovery Rate 99.2% Powder Coating SystemPackage &Shipping
High Recovery Rate 99.2% Powder Coating System


Working Processes
High Recovery Rate 99.2% Powder Coating SystemFAQHigh Recovery Rate 99.2% Powder Coating System


Contact Information
High Recovery Rate 99.2% Powder Coating System

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now