• 10 Minutes Fast Color Change 98% Recycling Rate Cyclone Powder Coating Booth
  • 10 Minutes Fast Color Change 98% Recycling Rate Cyclone Powder Coating Booth
  • 10 Minutes Fast Color Change 98% Recycling Rate Cyclone Powder Coating Booth
  • 10 Minutes Fast Color Change 98% Recycling Rate Cyclone Powder Coating Booth
  • 10 Minutes Fast Color Change 98% Recycling Rate Cyclone Powder Coating Booth
  • 10 Minutes Fast Color Change 98% Recycling Rate Cyclone Powder Coating Booth

10 Minutes Fast Color Change 98% Recycling Rate Cyclone Powder Coating Booth

After-sales Service: Engineer Overseas
Warranty: 2 Years
Type: Electrostatic Spraying Equipment
Application: Hardware Spraying Equipment
Coating: Powder
Certification: CE, ISO
Customization:
Diamond Member Since 2019

Suppliers with verified business licenses

Manufacturer/Factory
  • Overview
  • Production Process
  • Products Feature
  • Products application
  • Ordering Process
  • Why Choose Us
  • Company Introduction
  • FAQ
Overview

Basic Info.

Model NO.
HANNA2305
Method Type
Automatic
Condition
New
Transport Package
by Sea Container
Specification
customed
Trademark
Hinah
Origin
China
HS Code
8424899990
Production Capacity
20sets Per Month

Product Description

Fully Automatic Powder Coating Paint Line

 
10 Minutes Fast Color Change 98% Recycling rate Cyclone Powder Coating Booth 
Characteristic
:
Our Advantage:
1,Hanna intelligent gun, unique circuit board design, Complete solve the problem of workpiece powder grooves on the dead angle, groove with powder.Also Ultra-high cost performance ratio.
2,Hanna unique to the wind system which make the effective temperature difference control furnace temperature fluctuate 3 ºC, ensure that products without color difference,coating dose not fall off.
3,Hanna big cyclone recovery system powder recovery rate as high as 95%,ensure no dust spillover.Unique fast color change powder supply center, change color only 10 to 15 minutes.
 
10 Minutes Fast Color Change 98% Recycling Rate Cyclone Powder Coating Booth


 

Production Process

Production Process

(Customized according to customer requirements)

Powder spray coating: upper hanging→spraying (automatic, manual spraying)→baking curing (180-220ºC adjustable, 20min)→cooling→down hanging.
 

Procuction Process
Mode
Temperature(ºC)
Time
Type
Loading
Manual
RT
   Adjustable  
Pre- treatment
Automatic
50-60
10 mins
Dip tank pretreatment
Spraying pretreatment
Shot Blasting ,Sand Blasting ,Etc.
  Drying   Automatic   180-220   10mins  
Powder Coating
Automatic
RT
3-5 mins
Manual spraying
Automatic spraying
Robot painting
Curing
Automatic
180-220
20 mins
Tunnel oven,
Bridge oven,
Box oven .
Cooling
Automatic
RT
10-15 mins
 
Unloading
Manual
RT
   Adjustable  
 
 
 
 

Products Feature

Pre-treatment System
Pretreatment method:
1:Sand blasting / Shot blasting
2:
Dip tank pretreatment
3:Spraying pretreatment ( with liquid )

 
10 Minutes Fast Color Change 98% Recycling Rate Cyclone Powder Coating Booth
 

Powder Coating System


10 Minutes Fast Color Change 98% Recycling Rate Cyclone Powder Coating Booth
Fast color change system

1:Simple filter recovery
2:Big cyclone + secondary filter recovery
10 Minutes Fast Color Change 98% Recycling Rate Cyclone Powder Coating Booth
Simple filter recovery


1.Color change time: 15 minutes
2.Scope of application: within 3 colors
3.Powder recovery: 92%
4.Hanna patent: Filter element reclaimer quick disassembly convenient color change

 
2:Big cyclone + secondary filter recovery


1. No Dust Spillover ,Saving Powder
2. Quick Color Changing
(10-15 mins Automatic Color Changing ),Multi -Color Changing
3. Powder Recovery Rate As High As 95%
4. The Workpiece Groove Had No Bottoming Phenomenon
5. Full Consider The Need of Color Change ,Easy to Clean ,Save Time ,Improve Work Efficiency
10 Minutes Fast Color Change 98% Recycling Rate Cyclone Powder Coating Booth
 

Drying Oven And Curing Oven

 
No. Item Specification
1 Mode Curing furnace hot air circulation
2 Furnace temperature Curing furnace 180~220ºC(adjustable),Maximum 250ºC
3 Curing time 20 mins
4. Heating-up time Curing oven :≤20min (from ordinary temperature to 200ºC)
5 Entrance& exit form Bridge type, tunnel type ,box type
6 Heat source GAS ,Diesel,Electricity,Coal,Bio-particle and so on

 
10 Minutes Fast Color Change 98% Recycling Rate Cyclone Powder Coating Booth
Conveyor Transport System



10 Minutes Fast Color Change 98% Recycling Rate Cyclone Powder Coating Booth

 

 

Products application

Our projects:(we have Rich experience)

Hanna Technology keeps impressive records on serving clients like small manufacturers, government project, global corporation.
Many projects finished all over the world,
including China, Europe (UK, Ireland, Switzerland, Bulgaria, Cyprus, Croatia); New Zealand, Middle East (Qatar, Kuwait, Saudi Arabia, Egypt, Iraq); Asia (Thailand, Philippines, Kyrgyzstan); Latin America (Mexico,Chile, Ecuador,Argentina); Africa (Morocco, Nigeria, Kenya), and so on.
10 Minutes Fast Color Change 98% Recycling Rate Cyclone Powder Coating Booth

Ordering Process

We're not selling a machine, we're offering a solution. Is an important part of your business success.

10 Minutes Fast Color Change 98% Recycling Rate Cyclone Powder Coating Booth
 

Why Choose Us

 

Our Advantage:
1:Hanna intelligent gun, unique circuit board design, Complete solve the problem of workpiece powder grooves on the dead angle, groove with powder.Also Ultra-high cost performance ratio.
2:Hanna unique to the wind system which make the effective temperature differencecontrol furnace temperature fluctuate 3 ºC, ensure that products without color difference,coating dose not fall off.
3:Hanna big cyclone recovery system powder recovery rate as high as 98%, ensure no dust spillover.Unique fast color change powder supply center,change color only 10 to 15 minutes.4:Any problems with the equipment, our company guarantees to give solutions within 12 hours.5:The warranty period of the equipment is 2 years. In 2 years, spare parts will be provided free of charge for any problems caused by non-human factors

Company Introduction

Company Introduction


Since 1990,From simple manual spraying to automatic powder spraying system. We can provide you with innovative, rational and economical solutions.
We can support you with advanced technologies.Delivering the best powder coating equipments and turn-key solutions.
We've built thousands of optimal customized lines and systems for powder coating operations across China and around the world.
Our continuous research on the field as well as our constantly developing techniques and innovative nature of our engineering dpt.Enable our customers to catch up to the latest developments by modernizing their equipment partly or wholly, so as to improve performance, increase profits and maintain their competitiveness in the world of trade.
Our company has passed ISO9001 certification,CE certification, and has obtained more than 70 patents.

10 Minutes Fast Color Change 98% Recycling Rate Cyclone Powder Coating Booth
Packing And Shipping 
10 Minutes Fast Color Change 98% Recycling Rate Cyclone Powder Coating Booth
 

FAQ

 

Are you a trader or a factory ?
We are manufacturer and exporter. Our own factory was found in 1990,Our export office was established in 2014.

What should I provide if interested in your powder coating equipment ?
A.The material/size(max)/weight(max)of your workpieces.
B.How many of your daily output(one day=8 hours,one month=30 days)?
C.What heating power do you prefer: electric,gas, diesel or coal?
D.The size of your factory(length, width and height)?

How to ensure the quality of the equipment ?
A,We have hundreds of patents and passed the IS9001: 2015 quality management system certification.
B,The Technical Review Committee,reasonably determines and divides the stages of design, production, installation andcommissioning, and formulates detailed progress plans for each stage, Strengthen the quality assurance system and quality protection measures of equipment manufacturing department.
C,We manning quality inspectors specially to control the processing quality of product strictly.
 
How to install equipment after purchasing your equipment ?
A,We will provide installation information and installation videos.
B,Our engineers will guide the installation and run the equipment.
C,After the debugging, will provide complete training and track customer device usage.

How is your company's after-sales service done?
A,Provide the list of consumables to assist customers in establishing a comprehensive equipment maintenance system.
B,After the equipment is delivered to the customer, our company will send professionals to track the customer equipment for 60 days.
C,If customer has a device failure in the process of using the device, our company will operate the device remotely through the computer network through the authorization given by the customer, and eliminate all equipment failure problems.
D,Any problems with the equipment, our company guarantees to give solutions within 12 hours.

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now