Painting Powder Coating Line System for Door with Double Chain Conveyor

Product Details
Customization: Available
Application: Hardware Spraying Equipment, Plastic Spraying Equipment
Coating Type: Powder Coating
Manufacturer/Factory, Trading Company

360° Virtual Tour

Diamond Member Since 2019

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Self-branded
The supplier has 5 Self-brands, check the Audit Report for more information
Customization from Designs
The supplier provides design based customization services
100% Finished Products Inspection
The supplier inspects 100% of finished products.
R&D Capabilities
The supplier has 4 R&D engineers, you can check the Audit Report for more information
to see all verified strength labels (23)
  • Painting Powder Coating Line System for Door with Double Chain Conveyor
  • Painting Powder Coating Line System for Door with Double Chain Conveyor
  • Painting Powder Coating Line System for Door with Double Chain Conveyor
  • Painting Powder Coating Line System for Door with Double Chain Conveyor
  • Painting Powder Coating Line System for Door with Double Chain Conveyor
  • Painting Powder Coating Line System for Door with Double Chain Conveyor
Find Similar Products
  • Overview
  • Product Description
Overview

Basic Info.

Model NO.
HN24
Warranty
24 Months
Control
PLC Touch Screen
Technology
Electrostatic Powder Spraying
Spray Gun
Gema
Booth
PP/PVC Board
Oven Material
150mm Rock Wool Panel
Heating Energy
Gas/Electric/Diesel
Conveyor
China Best Brand
Electric Control Brand
Siemens
Recovery
Cyclone +Filters
Pretreatment
Shot Blasting/DIP Bath/Spraying Tunnel
Liquid Tank
PP/SUS304/SUS316
Type
Electrostatic Spraying Equipment
Coating
Powder
Certification
CE, ISO
Method Type
Automatic
Condition
New
After-sales Service
Agent, Service Center
Transport Package
by Sea Container
Specification
customed
Trademark
HANNA
Origin
China
HS Code
8424300000
Production Capacity
15

Product Description

Painting Powder Coating Line System for Door with Double Chain Conveyor
Painting Powder Coating Line System for Door with Double Chain Conveyor
Painting Powder Coating Line System for Door with Double Chain Conveyor

Product Description

 

Equipment constitute of powder coating line:
 
Pretreatment System Spraying pretreatment; immersion type; dip tank; shot blasting; sandblasting, etc.
Drying Oven Drying oven: dry the water after pre-treatment
Heating source: fuel can be natural gas, electricity, coal, diesel, bio pellets, etc
Powder Coating Booth Material: PP; PVC
1.The filter recovery coating booth
2.Large cyclone fast automatic color change coating booth (Recovery rate is up to 99.2%, ensure no powder spillover, color change within 10 mins)
Curing Oven Type: Tunnel curing oven; Bridge type curing oven 
Heating source: fuel can be natural gas, electricity, coal, diesel, bio pellets, etc
Conveyor Chain System C-Shaped closed rail and die-forged open type, stable operation, high efficiency, large bearing capacity, etc.

Painting Powder Coating Line System for Door with Double Chain Conveyor
Painting Powder Coating Line System for Door with Double Chain Conveyor
Painting Powder Coating Line System for Door with Double Chain Conveyor
All the powder coating equipment and paint spraying equipment are widely used in all metal workpieces.
Transportation industry, hardware industry, building materials decoration, security, home appliances, mechanical engineering, wire mesh,
Electrical appliances, instrumentation, radiators, security doors, pipes, valves, furniture, shelves, hangers, lamps, fire extinguishers and many other fields.
Painting Powder Coating Line System for Door with Double Chain Conveyor
Painting Powder Coating Line System for Door with Double Chain Conveyor
Painting Powder Coating Line System for Door with Double Chain ConveyorPainting Powder Coating Line System for Door with Double Chain Conveyor

Painting Powder Coating Line System for Door with Double Chain Conveyor
OUR ADVANTAGE:
Pollution free operation,Safe to operate,Maximum recovery efficiency,Durability,Quick colour change. Professional Design ,Professional Scheme ,Professional Installation.
1,Hanna intelligent gun, unique circuit board design, Complete solve the problem of workpiece powder grooves on the dead angle, groove with powder.
2,Hanna unique to the wind system which make the effective temperature difference control furnace t emperature fluctuate 3 ºC, ensure that products without color difference,coating dose not fall off.
3,Hanna big cyclone recovery system powder recovery rate as high as 99.2%,ensure no dust spillover.Unique fast color change powder supply center, change color only 10 to 15 minutes.   
Contact us immediately ! ! !
Service assurance:
1,Provide complete information, including equipment drawing, electrical circuit control chart and use maintenance instruction.
2,Equipment troubleshooting method.
3,Provide the list of consumables to assist customers in establishing a comprehensive equipment maintenance system.
4,After the equipment is delivered to the customer, our company will send professionals to track the customer equipment for 60 days.
5,If customer has a device failure in the process of using the device, our company will operate the device remotely through the computer network through the authorization given by the customer, and eliminate all equipment failure problems.
6,Any problems with the equipment, our company guarantees to give solutions within 12 hours. 7,The warranty period of the equipment is 2 years. In 2 years, spare parts will be provided free of charge for any problems caused by non-human factors
Painting Powder Coating Line System for Door with Double Chain Conveyor
Since 1990,From simple manual spraying to automatic powder spraying system. We can provide you with innovative, rational and economical solutions.
We can support you with advanced technologies.Delivering the best powder coating equipments and turn-key solutions.
We've built thousands of optimal customized lines and systems for powder coating operations across China and around the world.
Our continuous research on the field as well as our constantly developing techniques and innovative nature of our engineering dpt.
enable our customers to catch up to the latest developments by modernizing their equipment partly or wholly, so as to improve performance,
increase profits and maintain their competitiveness in the world of trade.
Our company has passed ISO9001 certification,CE certification, and has obtained more than 70 patents.
Painting Powder Coating Line System for Door with Double Chain Conveyor

Painting Powder Coating Line System for Door with Double Chain Conveyor


Painting Powder Coating Line System for Door with Double Chain Conveyor
Are you a trader or a factory?
We are manufacturer and exporter. Our own factory was found in 1990,Our export office was established in 2014.

What should I provide if interested in your powder coating equipment ?
A.The material/size(max)/weight(max)of your workpiece. B.How many of your daily output(one day=8hours,one month=30days)? C.What heating power do you prefer: electric, gas, diesel or coal? D.The size of your factory(length, width and height)?

How to ensure the quality of the powder coating equipment?
A,We have hundreds of patents and passed the IS9001:2015 quality management system certification. B,The Technical Review Committee, reasonably determines and divides the stages of design, production, installation and commissioning, and formulates detailed progress plans for each stage, Strengthen the quality assurance system and quality protection measures of equipment manufacturing department. C,We manning quality inspectors specially to control the processing quality of product strictly.

How to install powder coating equipment after purchasing your equipment?
A,We will provide installation information and installation videos
B,Our engineers will guide the installation and run the equipment.
C,After the debugging, will provide complete training and track customer device usage.

How is your company's after-sales service done?
A,Provide the list of consumables to assist customers in establishing a comprehensive equipment maintenance system.
B,After the equipment is delivered to the customer, our company will send professionals to track the customer equipment for 60 days.
C,If customer has a device failure in the process of using the device, our company will operate the device remotely through the computer network through the authorization given by the customer, and eliminate all equipment failure problems.
D,Any problems with the equipment, our company guarantees to give solutions within 12 hours.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier