In electrostatic powder coating, the curing oven is one of the most important equipment in the production line of
powder coating equipment, and its temperature uniformity is an important index to ensure the quality of the coating.
1, Save fuel, curing furnace insulation board are all plug-in board, seamless docking, thermal bridge transmission
technology.
2, Safety is high, the burning unit that links the curing tunnel, automatically ventilates first, then ignites to eliminate
safety hazards.
3, Oil-burning heating type, hot air circulation air supply and return reach a balance, reasonable layout, uniform
furnace temperature.
4, Gas direct heat type, gas 100% into the furnace, high efficiency, no waste.
Heat source mode:Natural gas, liquefied gas, petroleum, electricity, coal, biological particles and other methods are available for customers to choose.
Our burner is equipped with proportional adjustment and frequency conversion. The reaction signal of the probe is automatically adjusted to the amount of fire.
OUR ADVANTAGE:
Pollution free operation,Safe to operate,Maximum recovery efficiency,Durability,Quick colour change. Professional Design ,Professional Scheme ,Professional Installation.
1,Hanna intelligent gun, unique circuit board design, Complete solve the problem of workpiece powder grooves on the dead angle, groove with powder.
2,Hanna unique to the wind system which make the effective temperature difference control furnace t emperature fluctuate 3 ºC, ensure that products without color difference,coating dose not fall off.
3,Hanna big cyclone recovery system powder recovery rate as high as99.2%,ensure no dust spillover.Unique fast color change powder supply center, change color only 10 to 15 minutes.
SERVICE ASSURANCE:
1,Provide complete information, including equipment drawing, electrical circuit control chart and use maintenance instruction.
2,Equipment troubleshooting method.
3,Provide the list of consumables to assist customers in establishing a comprehensive equipment maintenance system.
4,After the Powder Coating Production Line is delivered to the customer, our company will send professionals to track the customer equipment for 60 days.
5,If customer has a device failure in the process of using the device, our company will operate the device remotely through the computer network through the authorization given by the customer, and eliminate all equipment failure problems.
6,Any problems with the Powder Coating Production Line, our company guarantees to give solutions within 12 hours.
7, The warranty period of the equipment is 2 years. In 2 years, spare parts will be provided free of charge for any problems caused by non-human factors
Since 1990,From simple manual spraying to automatic powder spraying system. We can provide you with innovative, rational and economical solutions. We can support you with advanced technologies.Delivering the best powder coating equipments and turn-key solutions. We've built thousands of optimal customized lines and systems for powder coating operations across China and around the world. Our continuous research on the field as well as our constantly developing techniques and innovative nature of our engineering dpt. enable our customers to catch up to the latest developments by modernizing their equipment partly or wholly, so as to improve performance, increase profits and maintain their competitiveness in the world of trade. Our company has passed ISO9001 certification,CE certification, and has obtained more than 70 paten.
Are you a trader or a factory?
We are manufacturer and exporter. Our own factory was found in 1990,Our export office was established in 2014.
What should I provide if interested in your powder coating equipment ?
A.The material/size(max)/weight(max)of your workpiece. B.How many of your daily output(one day=8hours,one month=30days)? C.What heating power do you prefer: electric, gas, diesel or coal? D.The size of your factory(length, width and height)?
How to ensure the quality of the powder coating equipment?
A,We have hundreds of patents and passed the IS9001:2015 quality management system certification. B,The Technical Review Committee, reasonably determines and divides the stages of design, production, installation and commissioning, and formulates detailed progress plans for each stage, Strengthen the quality assurance system and quality protection measures of equipment manufacturing department. C,We manning quality inspectors specially to control the processing quality of product strictly.
How to install powder coating equipment after purchasing your equipment?
A,We will provide installation information and installation videos
B,Our engineers will guide the installation and run the equipment.
C,After the debugging, will provide complete training and track customer device usage.
How is your company's after-sales service done?
A,Provide the list of consumables to assist customers in establishing a comprehensive equipment maintenance system.
B,After the equipment is delivered to the customer, our company will send professionals to track the customer equipment for 60 days.
C,If customer has a device failure in the process of using the device, our company will operate the device remotely through the computer network through the authorization given by the customer, and eliminate all equipment failure problems.
D,Any problems with the equipment, our company guarantees to give solutions within 12 hours.