• Painting Equipment Powder Coating Electrostatic Application Dry-Finishing Process
  • Painting Equipment Powder Coating Electrostatic Application Dry-Finishing Process
  • Painting Equipment Powder Coating Electrostatic Application Dry-Finishing Process
  • Painting Equipment Powder Coating Electrostatic Application Dry-Finishing Process
  • Painting Equipment Powder Coating Electrostatic Application Dry-Finishing Process
  • Painting Equipment Powder Coating Electrostatic Application Dry-Finishing Process

Painting Equipment Powder Coating Electrostatic Application Dry-Finishing Process

After-sales Service: Field Maintenance and Repair Service
Warranty: 2 Years
Type: Powder Coating Line
Application: Plastic Spraying Equipment
Coating: Powder
Certification: CE, ISO
Customization:
Diamond Member Since 2019

Suppliers with verified business licenses

Manufacturer/Factory
  • Overview
  • Product Description
  • Product Type
  • Project Cases
  • Company Profile
  • Customer Visit
  • Ordering Process
  • FAQ
Overview

Basic Info.

Model NO.
HN-PSB
Method Type
Automatic
Condition
New
Usage
More Than 10 Years
Dimension(L*W*H)
Customized Size
Coating Color
Multi Color Can Be Chose
Powder Coating Booth
PP/PVC
Powder Recovery Rate
98%
Powder Recovery Time
10-15 Mins
Transport Package
Wooden Box Packing, Container. or as Customers′ R
Specification
Customized
Trademark
Hanna
Origin
Hebei, China (Mainland)
HS Code
8424300000
Production Capacity
100 Sets/Year

Product Description

Product Description

Powder Coating System-Customized, Automatic/Manual Powder Coating System

No.
 
Process Temperature (ºC) Time (min) Remark
1 Workpiece Loading
 
RT    
2 Pretreatment
(Dipping tank/spraying/shotblasting)
30-50 3-15 as per the chemical supplier
3 Drying Oven
 
180-220 10-15  
4 Powder Spraying System
 
RT    
5 Curing Oven
 
200-250 15-25  
6 Cooling
 
RT    
7 Workpiece Unloading
 
RT    
Product Type


Pretreatment System
Spray Pretreatment
Painting Equipment Powder Coating Electrostatic Application Dry-Finishing Process
Stainless Steel Spraying Tunnel                                              Stainless Steel Chemical Tank With Pump                   Spraying Nozzle


Dip Tank Pretreatment
Painting Equipment Powder Coating Electrostatic Application Dry-Finishing ProcessPP Plate                                                                                                           Automatic Dosing System                     Automatic Lifting System

Powder Coating Booth
Painting Equipment Powder Coating Electrostatic Application Dry-Finishing ProcessQuick Coloar Change Powder Coating Booth With Cyclone                                               Quick Assemble Filter Recovery Powder Coating Booth
* Powder recovery rate as high as 99.2%                                                                  * Powder recovery rate: 98%
* Color change time: 10-15 minutes                                                                          * Color change time: 15 minutes
* Suitable for multiple color more than 3                                                                   * Reduce production stagnation time and increase productivity

* No dust spillover, reduce powder waste                                                                 * Advantages: Economical
* Save labor time                                                                                                      * Disadvantages: Not suitable for multiple color change

* Improve the quality of spraying


Drying&Curing Ovens
Painting Equipment Powder Coating Electrostatic Application Dry-Finishing ProcessBridge Type Oven                                                          Tunnel Type Oven                                                                       Box Type Oven

Hanna Oven Advantages:
1.The air curtain are at both ends of the oven, the hot air in the oven won't dissipate to outside, saving the fuel .
2. Curing oven insulation board are all plug-in board, seamless docking, thermal bridge transmission technology.
3. Hot air circulation air supply and return reach a balance, reasonable layout, uniform oven temperature. After testing, the temperature difference in the oven is less than ± 3 ºC.

Painting Equipment Powder Coating Electrostatic Application Dry-Finishing Process
150mm thickness insulation layer                                               Inside view for our curing oven                                                      Oven temperature tracker record
 
Project Cases

At Hanna, we do more than just build equipment and powder coaing lines.
Our staff includes coating system designers, powder and chemistry experts, control systems engineers, technical support personnel, installation technicians and experienced trainers.

We build equipments with Hanna and Zhanyao brand, but also we work directly with OEM clients to provide "private label" powder coating equipment manufactured to their specifications.

We've built thousands of optimal customized lines and systems for powder coating operations across China and around the world. Hanna's list of satisfied clients includes successful small manufacturers, government organizations, and global corporations.

You won't find a better combination of quality, value and support anywhere in this industry. Each piece of equipment is built to meet your specific needs. To make sure you get the best results, our factory-authorized technician team will help you work through the details and get the results you need. We will design, build, deliver your automated system and if more services needed, we can help to install, fine-tune and train your operators to get premium results.

Painting Equipment Powder Coating Electrostatic Application Dry-Finishing Process

Company Profile

Painting Equipment Powder Coating Electrostatic Application Dry-Finishing Process
Since 1990, from simple manual spraying to automatic powder spraying system. We can provide you with innovative, rational and economical solutions. We can support you with advanced technologies.Delivering the best powder coating equipments and turn-key solutions. We've built thousands of optimal customized lines and systems for powder coating operations across China and around the world. Our continuous research on the field as well as our constantly developing techniques and innovative nature of our engineering dpt. enable our customers to catch up to the latest developments by modernizing their equipment partly or wholly, so as to improve performance, increase profits and maintain their competitiveness in the world of trade. Our company has passed ISO9001 certification,CE certification, and has obtained more than 70 patents.

Painting Equipment Powder Coating Electrostatic Application Dry-Finishing Process

Painting Equipment Powder Coating Electrostatic Application Dry-Finishing Process
Customer Visit

Painting Equipment Powder Coating Electrostatic Application Dry-Finishing Process

Ordering Process

Painting Equipment Powder Coating Electrostatic Application Dry-Finishing Process

FAQ

Are you a trader or a factory?
We are manufacturer and exporter. Our own factory was found in 1990,Our export office was established in 2014.

What should I provide if interested in your powder coating equipment ?
A. The material/size(max)/weight(max)of your workpiece.
B. How many of your daily output(one day=8hours,one month=30days)?
C. What heating power do you prefer: electric,gas, diesel or coal?
D. The size of your factory(length, width and height)?


How to ensure the quality of the equipment?
A. We have hundreds of patents and passed the IS9001:2015 quality management system certification.
B. The Technical Review Committee,reasonably determines and divides the stages of design, production, installation and
commissioning, and formulates detailed progress plans for each stage, Strengthen the quality assurance system and quality protection measures of equipment manufacturing department.
C. We manning quality inspectors specially to control the processing quality of product strictly.

How to install equipment after purchasing your equipment?
A. We will provide installation information and installation videos
B. Our engineers will guide the installation and run the equipment.
C. After the debugging, will provide complete training and track customer device usage.

How is your company's after-sales service done?
A. Provide the list of consumables to assist customers in establishing a
comprehensive equipment maintenance system.
B. After the equipment is delivered to the customer, our company will send professionals to track the customer equipment for 60 days.
C. If customer has a device failure in the process of using the device,our company will operate the device remotely through the computer network through the authorization given by the customer, and eliminate all equipment failure problems. D. Any problems with the equipment, our company guarantees to give solutions within 12 hours.

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now