Customization: | Available |
---|---|
After-sales Service: | Provide |
Warranty: | Provide |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Process Name | Mode | Temperature(ºC) | Time | Remark |
Degrease | Spraying | 50-60 | 3mins | |
Rinse 1 | Spraying | RT | 1min | |
Rinse 2 | Spraying | RT | 1min | |
film | Spraying | RT | 1min | |
rinse 3 | sprying | RT | 1 MIN | |
* All the pretreatment time confirm by chemical supplier |
1 | Spray shed L1.4xW1.2xH4m |
All use stainless steel plate SUS304 material, vertical plate 1.5mm, continuous welding after bending. |
2 | Spray tank 5 pcs |
It is welded by stainless steel plate SUS304/2.0mm. |
3 | Spray pump 5 pcs |
Adopt maintenance-free upright pump, dry oil seal, anti-idling and anti-corrosion. |
4 | Pipelines, nozzles, valves | Material pp |
5 | Filters |
At all bath tanks, AISI 304 stainless steel wire filters |
6 | Maintenance and pressure adjustment valves |
Valves which are installed between spray pumps and liquid tanks are ensuring removal and repair in case of malfunction without liquid loss. |
7 | Spray collectors and pipes |
The spray collectors will be installed to suitable active sections and the spray pipes will be tightened to the collectors by using brackets. |
8 | Exhaust aspirator |
2 pcs of 800 m3/h capacity exhaust fans are located at the top of the tunnel. |
9 | Suspension chain protection system | Closed brush on top of shed |
Equipment | Application |
Pre-treatment System | Better powder coating of the work-piece. |
Powder Coating Room | Spraying on the surface of the work-piece. |
Big Cyclone | Automatic fast color change. |
Transport System | Delivery of work-pieces. |
Curing Oven | It makes the powder attaching to the work-piece. |
Heating System | The fuel can choose diesel oil,gas,electric etc. |