Customization: | Available |
---|---|
Application: | Aerospace Industry, Appliance Industry, Construction Industry, Electronics Industry, Furniture Industry |
Heating system: | Diesel, electric, gas, LPG |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1 | Save fuel, curing furnace insulation board are all plug-in board, seamless docking, thermal bridge transmission technology. |
2 | Safety is high, the burning unit that links the curing tunnel, automatically ventilates first, then ignites to eliminate safety hazards. |
3 | Oil-burning heating type, hot air circulation air supply and return reach a balance, reasonable layout, uniform furnace temperature. |
4 | Gas direct heat type, gas 100% into the furnace, high efficiency, no waste. |
Equipment constitute of powder coating line:
Pretreatment System | Spraying pretreatment; immersion type; dip tank; shot blasting; sandblasting, etc. |
Drying Oven | Drying oven: dry the water after pre-treatment Heating source: fuel can be natural gas, electricity, coal, diesel, bio pellets, etc |
Powder Coating Booth | Material: PP; PVC 1.The filter recovery coating booth 2.Large cyclone fast automatic color change coating booth (Recovery rate is up to 99.2%, ensure no powder spillover, color change within 10 mins) |
Curing Oven | Type: Tunnel curing oven; Bridge type curing oven Heating source: fuel can be natural gas, electricity, coal, diesel, bio pellets, etc |
Conveyor Chain System | C-Shaped closed rail and die-forged open type, stable operation, high efficiency, large bearing capacity, etc. |
Production Process
(Customized according to customer requirements)
Procuction Process
|
Mode
|
Temperature(ºC)
|
Time
|
Type |
Loading
|
Manual
|
RT
|
Adjustable | |
Pre- treatment
|
Automatic
|
50-60
|
10 mins
|
Dip tank pretreatment Spraying pretreatment
Shot Blasting ,Sand Blasting ,Etc.
|
Drying | Automatic | 180-220 | 10mins | |
Powder Coating
|
Automatic
|
RT
|
3-5 mins
|
Manual spraying Automatic spraying Robot painting |
Curing
|
Automatic
|
180-220
|
20 mins
|
Tunnel oven,
Bridge oven,
Box oven .
|
Cooling
|
Automatic
|
RT
|
10-15 mins
|
|
Unloading
|
Manual
|
RT
|
Adjustable |
No. | Item | Specification |
1 | Mode | Curing furnace hot air circulation |
2 | Furnace temperature | Curing furnace 180~220ºC(adjustable),Maximum 250ºC |
3 | Curing time | 20 mins |
4. | Heating-up time | Curing oven :≤20min (from ordinary temperature to 200ºC) |
5 | Entrance& exit form | Bridge type, tunnel type ,box type |
6 | Heat source | GAS ,Diesel,Electricity,Coal,Bio-particle and so on |