• Pretreatment DIP Tank Washing Powder Painting Equipment
  • Pretreatment DIP Tank Washing Powder Painting Equipment
  • Pretreatment DIP Tank Washing Powder Painting Equipment
  • Pretreatment DIP Tank Washing Powder Painting Equipment
  • Pretreatment DIP Tank Washing Powder Painting Equipment
  • Pretreatment DIP Tank Washing Powder Painting Equipment

Pretreatment DIP Tank Washing Powder Painting Equipment

After-sales Service: 1 Year
Warranty: 1 Year
Type: Pretreatment Machine
Application: Hardware Spraying Equipment
Coating: Powder
Certification: CE, ISO
Customization:
Diamond Member Since 2019

Suppliers with verified business licenses

Manufacturer/Factory

Basic Info.

Model NO.
Hanna
Method Type
Manual
Condition
New
Processing Tanks
3-5
Pretreatment
Degreasing, Rinsing, Phosphating
Rinsing
RO Rinsing
Size
Follow Products Size
Lifting
Electrical Hoist
Motor
Famous Brand
Control
Manual Control
Degreasing
2 Mins
Washing
1 Mins
Transport Package
Pallet
Specification
Iron
Trademark
Hinah
Origin
China
Production Capacity
100 Sets / Year

Product Description

Pretreatment DIP Tank Washing Powder Painting Equipment
How to design an optimal solution for the pwoder coating line
 
How to design an optimal solution for the pwoder coating line
1. Comprehensive analysis of customer cost budget and capacity requirements, select manual delivery mode;
2. Delivery method:Manual ;
3. Comprehensive analysis of workpiece weight, size, shape and other factors, select the ground rail mode and design the
optimal running length;
POWDER COATING PLANT
WE DESIGN THE TURN-KEY POWDER COATING SOLUTION
Design the whole line to cover less workshop space. Make sure the best running of the whole line with the workpiece and easier operations of workers. High quality materials with professional design and productions. The line will be assembled and tested before delivery ( clients will be warmly welcomed to visit and inspect the quality and operations at any time) 3D assemble drawings will be sent to help clients do assemble works very easy and efficient. Make arrangements in advance to make sure the products be delivered in time. Use space mostly, easier operations, high working efficiency, low noise, environmental friendly.
All details should be made based on the details clients supplied and confirmed;
 
Equipment
Application
Washing cleaning pretreatment system
Dipping tank / Bath spraying
Drying oven
100mm Rock wool insulation material; Diesel,gas ,electric as heating energy
Powder coating equipment
Quickly color change cyclone powder coating booth; Filter recovery powder coating cabin
Curing oven
batch oven, 150mm insulation thickness
Conveyor system
Manual slidding conveyor, semi automatic trolley
Pretreatment DIP Tank Washing Powder Painting Equipment
Dipping Tank
Pretreatment DIP Tank Washing Powder Painting Equipment
Pretreatment DIP Tank Washing Powder Painting Equipment
Pretreatment DIP Tank Washing Powder Painting Equipment




Packing & Shipment
Pretreatment DIP Tank Washing Powder Painting Equipment
Pretreatment DIP Tank Washing Powder Painting Equipment
Pretreatment DIP Tank Washing Powder Painting Equipment

Pretreatment DIP Tank Washing Powder Painting Equipment
FAQ
FAQ
Are you a trader or a factory?
We are manufacturer and exporter. Our own factory was found in 1990,Our export office was established in 2014.
What should I provide if interested in your powder coating equipment ?
A.The material/size(max)/weight(max)of your workpiece.
B.How many of your daily output(one day=8hours,one month=30days)?
C.What heating power do you prefer: electric,gas, diesel or coal?
D.The size of your factory(length, width and height)?
How to ensure the quality of the equipment?
A,We have hundreds of patents and passed the IS9001:2015 quality management system certification.
B,The Technical Review Committee,reasonably determines and divides the stages of design, production, installation and commissioning, and formulates detailed progress plans for each stage, Strengthen the quality assurance system and quality protection measures of equipment manufacturing department.
C,We manning quality inspectors specially to control the processing quality of product strictly.
How to install equipment after purchasing your equipment?
A,We will provide installation information and installation videos
B,Our engineers will guide the installation and run the equipment.
C,After the debugging, will provide complete training and track customer device usage.
How is your company's after-sales service done?
A,Provide the list of consumables to assist customers in establishing a
comprehensive equipment maintenance system.
B,After the equipment is delivered to the customer, our company will send professionals to track the customer equipment for 60 days.
C,If customer has a device failure in the process of using the device,our company will operate the device remotely through the computer network through the authorization given by the customer, and eliminate all equipment failure problems. D,Any problems with the equipment, our company guarantees to give solutions within 12 hours.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now