Customization: | Available |
---|---|
Application: | Hardware Spraying Equipment |
Warranty: | 2 Years |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Pretreatment System | Spraying pretreatment; immersion type; dip tank; shot blasting; sandblasting, etc. |
Drying Oven | Drying oven: dry the water after pre-treatment Heating source: fuel can be natural gas, electricity, coal, diesel, bio pellets, etc |
Powder Coating Booth | Material: PP; PVC 1.The filter recovery coating booth 2.Large cyclone fast automatic color change coating booth (Recovery rate is up to 99.2%, ensure no powder spillover, color change within 10 mins) |
Curing Oven | Type: Tunnel curing oven; Bridge type curing oven Heating source: fuel can be natural gas, electricity, coal, diesel, bio pellets, etc |
Conveyor Chain System | C-Shaped closed rail and die-forged open type, stable operation, high efficiency, large bearing capacity, etc. |
The automatic painting equipment automatically covers the protective layer or decorative layer on the surface of metal and non-metal, and replace the manual labor operation with intelligent operation. The alias has painting robot and automatic painting equipment.
Are you a trader or a factory ?We are manufacturer and exporter.
Our own factory was found in 1990,
Our export office was established in 2014.
What should I provide if interested in your powder coating equipment ?
A.The material/size(max)/weight(max)of your workpieces.
B.How many of your daily output(one day=8 hours,one month=30 days)?
C.What heating power do you prefer: electric,gas, diesel or coal?
D.The size of your factory(length, width and height)?
How to ensure the quality of the equipment ?
A,We have hundreds of patents and passed the IS9001: 2015 quality management system certification.
B,The Technical Review Committee,reasonably determines and divides the stages of design, production, installation and
commissioning, and formulates detailed progress plans for each stage, Strengthen the quality assurance system and quality protection measures of equipment manufacturing department.
C,We manning quality inspectors specially to control the processing quality of product strictly.
How to install equipment after purchasing your equipment ?
A,We will provide installation information and installation videos.
B,Our engineers will guide the installation and run the equipment.
C,After the debugging, will provide complete training and track customer device usage.
How is your company's after-sales service done?
A,Provide the list of consumables to assist customers in establishing a comprehensive equipment maintenance system.
B,After the equipment is delivered to the customer, our company will send professionals to track the customer equipment for 60 days.
C,If customer has a device failure in the process of using the device, our company will operate the device remotely through the computer network through the authorization given by the customer, and eliminate all equipment failure problems. D,Any problems with the equipment, our company guarantees to give solutions within 12 hours.